top of page

Ionia odos - Evinos Bridge

Subject: COMPLETE STUDY Stage: APPLICATION STUDY Employer: TEPNA A.E. Year: 2010

Double-span bridge, 256m long, with three spans (68+120+68), constructed using the cantilever method. Fixed deck slope of 7%, pedestal heights ~22m founded on piles. Horizontal drawing: curve with central axis radius R=750m.

Ionia odos - Evinos Bridge

Static project (Bridges)

bottom of page