top of page
Civil Engineering Consultants
Ionia odos - Evinos Bridge
Subject: COMPLETE STUDY Stage: APPLICATION STUDY Employer: TEPNA A.E. Year: 2010
Double-span bridge, 256m long, with three spans (68+120+68), constructed using the cantilever method. Fixed deck slope of 7%, pedestal heights ~22m founded on piles. Horizontal drawing: curve with central axis radius R=750m.
Static project (Bridges)
bottom of page