top of page

Field of activity

Check of static adequecy of warehous at Vasiliadi beach in order to use from commercial navigation ministry

Subject: Structural Design, Stage: Preliminary Design, Owner: Public Landed Company S.A, (KED), Contractor: Public Landed Company S.A. (KED), Budget: 26.412.326 euro, Year: 1998

Construction drawings for sheikh zayed bridge at Abu Dhabi (U.A.E.)

Full recovery - Rehabilitation, helth center of the municipality of keratea

Scope of Works: Static Design Stage: Final & Detailed Design Client: Konstantinos Priftis Contractor: TRITONACT S.A. Budget: Euro Year: 2005

Placeholder Image

General Hospital "IASIS"

Subject: Structural Design, Stage: Final and Detailed Design, Owner: OLYMBIO THERAPEYTIRIO SA, Contractor: TRITON ACT SA, Budget: 14.573.514 Euro, Year: 2002

Placeholder Image

General Hospital "Medical park of Athens"

Subject: Structural Design, Stage: Final and Detailed design, Owner: Eurosite Health Services Sa, Contractor: GEK - TERNA SA, Budget: 44.402.054 Euro, Year: 2003

Illisos bridge at olympic beach volley plant

Subject: Structural Design of Bridge, Stage: Final Design, Owner: EYDE 2004, Contractor: J/V GEK-TERNA, Budget: 2.800.000 EURO, Year: 2002

Ionia odos - Evinos Bridge

Subject: COMPLETE STUDY Stage: APPLICATION STUDY Employer: TEPNA A.E. Year: 2010

Double-span bridge, 256m long, with three spans (68+120+68), constructed using the cantilever method. Fixed deck slope of 7%, pedestal heights ~22m founded on piles. Horizontal drawing: curve with central axis radius R=750m.

Ionia odos, deviation of Agrinion

Subject: Structural Design of Bridges and Culverts, Stage: Final Design, Owner: EYDE/MEDE, Contractor: J/V TERNA SA - MHXANIKH SA, Year: 2005-2006

New central railway station of Athens

Subject: Structural Design, Stage: Final and Detailed Design, Owner: Greek Railway Authority S.A. (OSE), Budget: 11.738.811 euro, Year: 2003-2004

New cultural center on 206 peiraios St. owned by "MICHALIS KAKOGIANIS" Organization

Scope of Works: Static Design Stage: Final & Detailed Design Client: "Michalis Kakogiannis" Organization Contractor: J & P AVAX Budget: Euro Year: 2006

New industrial bulding of alouminon attikis at ferres

Subject: Architectural, Structural and E/M design, Stage: Preliminary, Final and Construction design, Owner: ALOUMINION ATTIKHS, Contractor: ALTE SA, Budget: 4.402.504 euro, Year: 1997

Star channel television building

Subject: Structural Design, Stage: Final Design and Construction Drawings, Owner: DIOLKOS SA-LAMDA DEVELOPMENT SA, Contractor: AKTOR SA, Budget: 4,000,000 Euro, Year: 2006

bottom of page